Skip to content

Work Breakdown Structure (WBS) ​

📊 Project Management

EcoGuard — Work Breakdown Structure

A hierarchical decomposition of the total scope of work to be carried out by the team to accomplish the project objectives and create the required deliverables.


Work Breakdown Structure Diagram

1. Project Initiation & Planning ​

  • 1.1 Requirement Analysis
    • 1.1.1 Gather requirements from stakeholders
    • 1.1.2 Define sustainability metrics and compliance standards (EU CSRD, ISO 14064, GHG Protocol)
    • 1.1.3 Finalize System Requirements Specification (SRS)
  • 1.2 Project Planning
    • 1.2.1 Develop project schedule and timelines
    • 1.2.2 Resource allocation and role definition (DevOps, Lead, Sustainability Officer)
    • 1.2.3 Define testing and quality assurance strategy

2. System Architecture & Design ​

  • 2.1 High-Level Design (HLD)
    • 2.1.1 Design overall system architecture (GitLab CI/CD Integration, Agent Network)
    • 2.1.2 Define data flow between GitLab APIs, Electricity Maps, and AI Agents
  • 2.2 Low-Level Design (LLD)
    • 2.2.1 Design database and storage schema for carbon footprint data
    • 2.2.2 Define API endpoints and data structures
    • 2.2.3 Design AI agent prompts and logic flows

3. Core Development & Implementation ​

  • 3.1 AI Agent System Development
    • 3.1.1 Develop Carbon Footprint Agent (Calculation & Forecasting)
    • 3.1.2 Develop Sustainability Compliance Agent (Reporting & Auditing)
    • 3.1.3 Develop Resource Optimization Agent (Anomaly Detection & Remediation)
    • 3.1.4 Develop Dashboard Data Agent (Data Aggregation & Formatting)
    • 3.1.5 Develop Eco-Friendly Deployment Agent (Smart Scheduling)
  • 3.2 Integrations & APIs
    • 3.2.1 Implement GitLab API integration for fetching pipeline data
    • 3.2.2 Implement Electricity Maps API integration for real-time carbon intensity
  • 3.3 Frontend & Dashboard Development
    • 3.3.1 Develop emission trend dashboards
    • 3.3.2 Implement alerting UI and threshold configuration
    • 3.3.3 Create report generation and export interfaces (PDF/CSV)

4. Testing & Quality Assurance ​

  • 4.1 Test Case Generation
    • 4.1.1 Define manual test cases in Excel
    • 4.1.2 Generate AI-driven edge cases using TestGPT
  • 4.2 Automated Testing
    • 4.2.1 Develop unit tests for AI agents using PyTest
    • 4.2.2 Develop integration tests for API endpoints
  • 4.3 System Validation
    • 4.3.1 Execute full system test in sandbox environment
    • 4.3.2 Validate compliance report accuracy

5. Deployment & Release ​

  • 5.1 CI/CD Pipeline Setup
    • 5.1.1 Configure automated deployment pipelines for EcoGuard
    • 5.1.2 Set up environment variables and secure secrets
  • 5.2 Production Release
    • 5.2.1 Deploy to production environment
    • 5.2.2 Conduct final smoke tests
  • 5.3 Documentation & Handoff
    • 5.3.1 Finalize user guides and architecture docs
    • 5.3.2 Conduct handover training for DevOps team

EcoGuard sustainability documentation